banner下面提交表单 (#30)

Your Trusted Partner for High-Volume Projects

PCBCool supports high-volume PCB fabrication and assembly with a global manufacturing footprint and extensive mass production experience.

For PCB fabrication, we operate two advanced manufacturing facilities in Sichuan and Shenzhen, China, with a combined floor space of 55,000 square meters and monthly capacity of 110,000 square meters.

For assembly, we have production sites in China, Malaysia, and Mexico, equipped with 25 SMT lines, 9 DIP lines, and 4 manual assembly lines, with monthly assembly capacity exceeding 1.1 billion placement points.

PCBCool’s Mass Production Capabilities

Parameters
MaterialFR4 (140Tg, 170Tg, 180Tg), Halogen-free, Metal Core, Polyimide, Rogers 4350B/3003/4003C/5880, Taconic, Teflon, Mix-Lamination, etc
Material BrandsKB, ITEQ, SY, ISOLA, Rogers (Arlon), Ventec, Laird, Nelco, Bergquist, DENKA, Panasonic, Taconic, or other laminate on customer's request
Layer Count1~40
FlammailityUL 94V-0
Thermal Conductivity0.3W-400W/mk
Quality StandardsIPC Classes 2/3
HDI Build-upAny Layer, up to 4+N+4
Board Dimension1-2 Layers: 1500mmx600mm Multilayer: 620mmx720mm
Board Thickness0.037mm-6.5mm
Min Thickness2-layer: 0.1mm 4-layer: 0.4mm 6-layer: 0.6mm 8-layer: 0.8mm 10-layer: 1mm More than 10 layers: 0.5*Layer Count*0.2mm
Copper Thickness1/3~33oz
Solder Mask ColorsWhite, Black, Green, Blue, Red, Yellow, Orange, Purple, Matte Green, Matte Black
Solder Mask BrandsGreen: RongDa, KuangShun White: Coants, LanBang, Taiyo
Solder Mask Thickness0.2mil-1.6mil
Solder Mask Dam50μm
Surface FinishesBare Copper, Hasl lead-free, Carbon Ink, ENIG, Gold Fingers, OSP, IAg, ISn, etc
Plating ThicknessHASL: Copper Thickness: 20-35um Tin: 5-20 um Immersion Gold: Nickel: 100u"-200u" Gold: 2u" -4u" Hard Plated Gold: Nickel: 100u"-200u" Gold: 4u"-8u" Golden Finger: Nickel: 100u"-200u" Gold: 5u"-15u" Immersion Silver: 6u"-12u" OSP: Film 8u"-20u"
Min Hole SizeLaser: 0.08mm Mechanical: 0.15mm
Min Trace Width/Spacing64μm/64μm
Minimum Solder Mask Clearance2mil
Min Annular Ring50μm
Min Pad to Pad Clearance40μm
Via Plugging0.2~0.8mm
Line Width/Space Tolerance±0.015mm
Board Thickness Tolerance±5%
Hole Diameter Tolerance±0.05mm
Hole Location Tolerance±2mil
Layer to Layer Registration≤100μm
S/M Registration≤38μm
Aspect RatioStandard: 25:1 Max.: 35:1
Blind Vias Aspect Ratio0.8:1
Outline Tolerance±0.1mm
V- CUT Tolerance±10mi
Bevel Edge± 5mil
Impedance & Tolerance50Ω;±10%
Warp and Twist≤0.50% (max cap)
Quality TestAOI, 100% E-test
Value-Added ServicesDFM Check, Expedited Production (24Hrs)
Featured ProcessesZ-axis Milling, Thick Copper, Copper Block Embedded, High-Frequency Foam Board, High-Frequency Mix-Lamination, Blind/Buried Via, Press-Fit Hole, Castellated Holes, Step Staggered, Resin Plugged Hole, Countersink/Counterbore Hole, Via in Pad, Edge-Plating, Impedance Control, Carbon Ink, Peelable Solder Mask, Gold Finger
Data FormatsGerber, DXF, PCBdoc, ODB++, HPGL, BRD, etc
CapabilitiesDaily 3750 Sqm Monthly 110,000 Sqm
China Mainland BaseMalaysia BaseMexico Base
Turnkey ServiceDesign + PCB FAB + Components Sourcing + PCB Assembly + Product AssemblyComponents Sourcing + PCB Assembly + Product AssemblyComponents Sourcing + PCB Assembly
Assembly TechnologiesTHT, SMT, Hybrid Mount, Subsystem AssemblyTHT, SMT, Hybrid Mount, Semi AssemblyTHT, SMT, Hybrid Mount, Subsystem Assembly
Manufacturing AbilitiesPrototyping, Low to High VolumePrototyping, Low/Medium/High VolumePrototyping, Low to Medium Volume
Component AbilitiesChips 0201mm BGA, QFP & CSP 0.25mm BGA repair and reballChips 0402mm BGA, QFP & CSP 0.25mm HDMI Connectors / Micro USB ConnectorsChips 0402mm BGA, QFP & CSP 0.3mm Press Fit / High Pin Count Connectors
SMT Lines11 Lines, Samsung / JT9 Lines, Samsung / Panasonic / Sony5 Lines, Siemens / Samsung
SMT CapabilitiesMonthly 788 Million PointsMonthly 298 Million PointsMonthly 63 Million Points
THT Lines3 Lines, Auto / Manual4 Lines, Auto / Manual2 Lines, Auto / Manual
Inspection MachinesSPI, AOI, 2D X-RaySPI, Optical Measuring (VMS-4030M), X-ray (SMX-1000)SPI, AOI, X-ray, Microscope to 20X
TestingICT/Function test/Burn-in test/Aging TestingICT/Function test/Burn-in testICT/Function test/Burn-in test
Assembly CostLower CostsLower CostsMedium Cost
Lead TimeAs fast as 9 days with shippingAs fast as 7 days with shippingAs fast as 3 days with shipping
Number of layersS<1m²1≤S<5m²5≤S<20m²20≤S<50m²50≤S<100m²100m²以上Expedited (≤3㎡)
2L45-75-76-98-109-1212~24 hours
4L56-86-88-1010-1210-151~4 working days
6L66-86-88-1010-1210-152~4 working days
8L76-86-88-1010-1210-154~6 working days
10L99-119-1110-1212-1413-175~9 working days
12L1010-1210-1211-1313-1514-187~14 working days
14L1010-1210-1211-1313-1514-187~14 working days
16L111313151617Contingent
18L121414161718Contingent
20L131414161819Contingent
22L151515182022Contingent
24L151515182022Contingent
26L151515182022Contingent
28L+151515182022Contingent

Commitment to Quality

An upward pointing arrow icon

Certification Compliance Support

  • Answer Support for ISO 9001 quality management system
  • Answer Compliance with ISO 14001 environmental management system
  • Answer Adherence to ISO 45001 occupational health and safety standards
  • Answer Compliance with IPC-A-610 and IPC J-STD-001 standards
  • Answer Support for RoHS / REACH environmental compliance
  • Answer Support for UL and CE certifications
  • Answer Support for ISO 13485, IEC 62031, and other industry-specific certifications
An icon for controlling the screen

Manufacturing Process Control

  • Answer Full BOM and lot traceability across production
  • Answer Material traceability (components, boards, solder paste, etc.)
  • Answer Process documentation for regulated manufacturing
  • Answer First Article Inspection (FAI) support
  • Answer In-process quality checks and monitoring
  • Answer Controlled ESD & cleanroom processes (if applicable)
  • Answer Complete inspection records and test reports
  • Answer Change control and nonconformance management

Flexible Solutions for Every Production Stage

Structure of Metal Core PCBs

At PCBCool, we take a customer-focused approach to high-volume manufacturing. Whether your project is still ramping up or already in full production, we offer flexible service options to match your needs.

  • Answer Engineering Support
  • Answer PCB Fabrication
  • Answer PCBA Assembly
  • Answer Box Build / System Integration
  • Answer Testing & Validation
  • Answer Supply Chain & Logistics
Structure of Metal Core PCBs
Metal Core PCB board

Built to Support Volume Production

Metal Core PCB board

We understand that choosing a volume PCB production partner requires a higher level of confidence. That is why we provide practical support to reduce risk and keep your program moving.

  • Answer Smooth transition from pilot runs to full-scale production
  • Answer Support for rolling orders, ongoing replenishment, and long-term programs
  • Answer Strong focus on lot-to-lot consistency and quality stability
  • Answer Better coordination across lead time, cost, and supply chain planning
  • Answer Suitable for industries such as industrial controls, telecommunications, and power systems
  • Answer Cost reduction through scale advantages and component substitution options

Why Choose PCBCool as Your High-Volume PCB Manufacturer

Success in high-volume PCB production is not just about making the product. It is about delivering it consistently, on schedule, and to specification.

If you need reliable support for volume production and consistent performance from batch to batch——

Frequently Asked Questions

Q1: When Is the Right Time to Start Discussing a High-Volume Production Project?

A: We recommend starting after sample validation is complete and pilot production has been approved. At that stage, the product design, BOM, and process direction are usually much clearer, which allows earlier evaluation of production risks and better preparation for materials, capacity, and delivery.

Q2: How Do You Keep the Transition from Pilot Runs to Volume Production Under Control?

A: We work to resolve the key issues identified during pilot runs before full production begins. This includes process feasibility, material stability, testing requirements, assembly details, and delivery planning, so the ramp-up is more stable and predictable.

Q3: How Do You Reduce Batch-to-Batch Variation in High-Volume Production?

A: We control consistency through raw material management, process execution, key process controls, inspection standards, and batch management.

Q4: Will You Replace Out-of-Stock Components Without Customer Approval?

A: No. Any component substitution is implemented only after customer approval.

Q5: How Do You Reduce the Impact of Component Shortages on Delivery?

A: We can get involved earlier in material planning and procurement. For components with supply risk, we can also discuss approved alternatives or safety stock strategies in advance to help protect delivery schedules.

Q6: Can You Support Ongoing Replenishment Instead of a One-Time Order?

A: Yes. We support rolling orders, ongoing replenishment, and long-term production programs based on your project schedule.

Q7: What Is the Most Common Risk Customers Overlook in Volume Production?

A: The most common issue is not a single technical challenge. It is moving too quickly with incomplete information. Typical examples include inconsistent file versions, unclear BOM restrictions, incomplete testing requirements, unconfirmed packaging requirements, or delivery plan changes made too late.

Q8: What Information Should Be Provided Before Placing an Order?

A: At a minimum, we recommend providing Gerber files, BOM, pick-and-place files, assembly drawings, test requirements, packaging requirements, and any special process notes. If your project has approved brand requirements, no-substitution rules, certification limits, labeling rules, traceability requirements, or split-shipment plans, those should also be defined up front.

Q9: Can You Follow Customer-Specified Brands, Part Numbers, or No-Substitution Rules?

A: Yes. If your project has clear requirements for brands, original manufacturers, part numbers, certification sources, or substitution limits, we can follow those rules accordingly.

Q10: Can You Work With Customer-Supplied Materials?

A: Yes. We support consigned materials, partial consignment, and mixed sourcing models based on project needs.

Q11: How Do You Handle Customer-Supplied Materials After Receipt?

A: We first perform the necessary receiving checks and basic inspection. If we find quantity mismatches, unclear identification, abnormal condition, or anything that does not meet assembly requirements, we will report it as early as possible.

Q12: Can You Support Functional Testing, Burn-In Testing, or Custom Testing?

A: Yes, provided the testing requirements are clearly defined in advance.

Q13: Can First Article or Critical Process Confirmation Be Done Before Volume Production?

A: Yes, and it is essential. First article approval, critical process confirmation, and assembly sample verification are all important steps to reduce deviation before full-scale production begins.

Q14: Can You Continue Supporting a Project if the Product Version Keeps Evolving?

A: Yes. For projects with ongoing revisions, we can support future version updates while maintaining continuity in volume production.

Q15: How Do You View Low-Price Demands in Volume Production?

A: For volume production, the lowest price is not always the best solution. The real value comes from building a more practical cost plan while keeping quality, delivery, consistency, and supply chain control in balance.

Q16: Can You Sign an NDA for Confidential Projects?

A: Yes. For projects with confidentiality requirements, we can sign an NDA before formal discussions and file transfer begin.

With PCBCool, You Get More Than Assembly

you get a partner committed to zero defects, global compliance, and lasting reliability.